We make the process of collecting all components and equipment’s needed for the construction of the plant as per the engineering design recommends.
The Erection includes the process from paving ways, constructing main structure, setting equipment and machinery and aligns it properly
The entire process of erection, testing and commissioning, we do divide into three main categories:

  • Pre-erection activities to be completed before starting of erection of the plant.
  • Erection of built-in parts of the plant.
  • Erection of main operating components of the hydro set. &
    To final act before putting the new piece of kit into use, it often involves testing the kit as an individual piece and checking that it’s fully integrated into its final system. We ensure that a modern generator has practical security and vibration modifications that interact with the current switch board.